• 0

Project Consultancy, Reports & Profiles

What are the Benefits of Starting a Business?

The dreams and passions of entrepreneurs often lead them to start their own businesses. Following your dreams will fulfil you in a way that working for someone else may not do. When you work for someone else, it can be hard to find the motivation to do your best work. Whatever you do, the owners of the company will reap the rewards. 

Starting up a business and using it for social benefit is one of the most fulfilling things about being an entrepreneur. Using your profits, you can choose to donate to nonprofits, charities, or community initiatives. 

Your ultimate goal as an entrepreneur is to cultivate financial independence. There is no limit to how lucrative your own business can be if you work hard and remain focused. There’s no reason why you cannot achieve your goal of building wealth. 

Why Start a Business in Assam? 


The Largest Economy in the North-East; 

Assam is the largest economy in North East India and is rapidly establishing itself as an employer of people and an inclusive growth engine through a balanced pattern of industrial investment.  

There is a great deal of emphasis by the Central and State Governments on creating an investment-friendly environment in North East India, and subsidies and incentives are offered to attract investors. The Union Development Budget includes 10% for North East India. 


Ease of Doing Business in Assam; 

Investment-friendly business climates are characterised by ease of doing business. Assam has undertaken the “Ease of Doing Business” reforms that have been prescribed by the Finance Ministry, along with Haryana, Himachal Pradesh, and Punjab. As a result, these states are now eligible to mobilise additional financial resources and have been given permission to borrow an additional Rs 5,034 crore through Open Market Borrowings. There is a very friendly climate for starting any business in Assam. 


Natural Resources in Assam;

India's tea production is dominated by Assam. The state produces 15 per cent of India’s crude oil from the wells at Digboi, Duliajan, and Sivasagar. 

In terms of natural gas production, it accounts for about half of India’s total onshore production. 

Several natural resources, including oil, natural gas, minerals, hydro energy, forest resources, and medicinal plants, make this region an ideal investment destination.

Nearly 50% of India’s tea production originates from the state, also home to numerous tea and food processing parks. Guwahati Tea Auction Centre (GTAC) is one of the world’s largest CTC tea auction centres. 

Natural gas and crude oil reserve located in Digboi, Assam, is India’s oldest operating refinery. The proximity of Assam to Southeast Asia provides the region with an advantage geographically. As a result of its existing and ongoing infrastructure initiatives, it is the best place for starting a business aiming at ASEAN markets. 


Locational Advantage; 

Assam is the gateway to the North-Eastern states, making it ideally situated to serve their needs and markets. 

Due to its geographical location, it enjoys favourable trade relations with neighbouring countries such as Bhutan, Bangladesh, Nepal, Myanmar, Thailand, China, etc. 

There is an excellent opportunity to tap into large markets in mainland India, South and Southeast Asia, ASEAN, SAARC, as well as the fastest-growing economies in the world. 

Due to its proximity to SAARC countries Bhutan, Nepal and Bangladesh, it offers international trade opportunities to foreign investors. 


Manpower Availability in Assam; 

Assam has a large number of English-speaking, skilled, semi-skilled, educated workers at a very low cost and a competitive rate. 


Roadways in Assam; 

In Assam, the total length of roads is approximately 69,000 km, including metalled and non-metallic surfaces. It makes up approximately 60% of the entire road network in the northeast. The major towns within the state are all connected by major highways.

 

Railways in Assam; 

The total length of the route is approximately 2435.13 km. The railway network in Assam is convenient and connects the state with the rest of India. Rail connections are good to several major towns in Assam, such as Dibrugarh, Tinsukia, Jorhat, Nagaon, Guwahati, Tezpur, Barpeta, Bongaigaon, etc.


Airways in Assam; 

Lokapriya Gopinath Bordoloi International Airport in Guwahati is 18 km from the city centre and has good connections with New Delhi, Kolkata, Mumbai, and Chennai.

Regular flights to and from Guwahati are operated. 


Inland Water Transportation;

The Brahmaputra is the country’s second national waterway. A commercial water transportation service is provided on the river Brahmaputra and Barak by two government-owned companies (Central Inland Waterways Corporation and the Directorate of Inland Waterways, Assam). Both passengers and goods are transported using these services. 

Waterways in Assam link it to Bangladesh, providing access to Chittagong, and also to Kolkata and Haldia (West Bengal, India). 


How to Start a Business in Assam? 


Discover Business Opportunities; 

Before starting a business venture, entrepreneurs should prepare a business plan. You should consult with an accountant and project consulting agencies before you make any final decisions. What kind of business you have is the most important factor. 

 

An Analysis of the Market;

To understand the feasibility of an enterprise, it is important to conduct a market study. The market study assists in better understanding the prevailing competition, existing market gaps, consumer needs and preferences, etc. 

 

Organization type selection; 

One needs to choose the form of Business Enterprise that he/she will set up. An entrepreneur’s right choice determines his or her control, power, risk, and responsibility, as well as how the profits and losses will be divided. There are various factors to consider, including the scale of operations, degree of control, capital, volumes of risk and liability, tax liability, etc.

 

There are several types of business organisations, including: 

     Sole Proprietorship

     Firm in partnership

     Co-operatives

     Public & Private Limited Company

     Societies

     Limited Liability Partnership

Business Name & Registration; 

To start any business in Assam, it must be named and registered with the appropriate authorities. 

 

Product Selection;

The following factors can be considered when selecting a product to be manufactured by the firm:- 

     Analyse product market size and structure

     Analysing the future demand

     Graphing the product life cycle

     Knowing each product’s shelf life

     Easy access to raw materials

     Production technology

 

Decide on a Location;

The success or failure of a business is largely determined by its location. An organisation’s future expansion plans, in addition to its present requirements, should be considered when making this decision.

 

Important factors to consider while selecting a location for starting a business in Assam; 

     Raw material availability

     Availability of skilled, semi-skilled, or unskilled labour

     Market proximity

     Transportation facilities

     A reliable supply of power and fuel

     Product-specific climate factors

     Competitive and complementary industries exist

 

Planning and arranging Project Funding;

For a business to begin, continue, expand, and grow, it needs finance. Hence, a financial plan must be prepared, which identifies the need for funding, the sources of funding, and how these funds will be used.

 

AD_20Art21


Reasons for buying our reports:

This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

This report provides vital information on the product like its characteristics and segmentation

This report helps you market and place the product correctly by identifying the target customer group of the product 

This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

The report provides a glimpse of government regulations applicable on the industry

The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

We use reliable sources of information and databases. And information from such sources is processed by us and included in the report


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Emerging business opportunities in Production of Adhesive (Fevicol Type)
Emerging business opportunities in Production of Adhesive (Fevicol Type)

Cement, mucilage, glue, and paste are all terms that are fr... Read More

Capacity :
1.0 MT per Day
Plant and Machinery cost:
47.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
165.00Lakhs
Add To Inquiry Basket
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger

Introduction:

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry

Introduction

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

 

Chocolate is a co... Read More

Capacity :
Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day
Plant and Machinery cost:
249.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
671.00Lakhs
Add To Inquiry Basket
Set up a Unit of Carbon Black Manufacturing Business
Set up a Unit of Carbon Black Manufacturing Business

 

Under regulated c... Read More

Capacity :
167 MT per day
Plant and Machinery cost:
2563.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
49.00%
Break Even Point (BEP):
25.00 %
TCI :
0.00 Lakhs
Cost of Project :
8249.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry

Introduction:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads

Introduction:... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

Chocolate is a general term... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Manufacture Carbon Black A Profitable Business Idea You Can Start
How to Manufacture Carbon Black A Profitable Business Idea You Can Start

Carbon black is made up of ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
30 Bedded Hospital Business Plan
30 Bedded Hospital Business Plan

A hospital is supposed to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the nation at large by providin... Read More

Capacity :
Special Ward Patients : 2 Patients / Day General Ward Patients: 16 Patients / Day Double Bedded Pati
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
604.00Lakhs
Add To Inquiry Basket
Construction Opportunities in Geotextiles for Roadways
Construction Opportunities in Geotextiles for Roadways

Geotextiles were used in roadway construction to stabilize roadways and their edges. These early geotextiles were made from natural fibres, fabrics... Read More

Capacity :
Geotextiles for Road & Construction: 2,934 Kgs / Day
Plant and Machinery cost:
326.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
665.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity :
Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost:
1321.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2890.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)
Active Pharma Ingredients (API) Manufacturing (Azithromycin, Cefixime, Telmisartan, Diclofenac sodium, Aceclofenac)

Active pharmaceutical ingredients are the active substances that are utilized in the manufacture of a drug and have a ... Read More

Capacity :
Azithromycin: 500 Kgs / Day Cefixime: 500 Kgs / Day Telmisartan: 50 Kgs / Day Diclofenac Sodium: 500
Plant and Machinery cost:
155.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
729.00Lakhs
Add To Inquiry Basket
Castor Oil from Castor Seeds Manufacturing Business
Castor Oil from Castor Seeds Manufacturing Business

The castor oil plant, Ricin us common is, may be a species of flowering plant within the spurge family, Euphorbiaceous... Read More

Capacity :
Castor Oil: 5 MT / Day Castor De-Oiled Cake: 7.2 MT / Day
Plant and Machinery cost:
106.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
374.00Lakhs
Add To Inquiry Basket
Surgical & N95 Mask Manufacturing Business Plan
Surgical & N95 Mask Manufacturing Business Plan

A surgical mask, also referred to as a procedure mask, medical mask or just as a face mask, is meant to be worn by health professionals during surg... Read More

Capacity :
Surgical Face Masks (each Pkts = 25 Pcs.): 576 Pkts / Day N95 Face Masks (each Pkts = 5 Pcs.): 2,880
Plant and Machinery cost:
359.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush
Earthmover JCB Bucket Pin Manufacturing and JCB Tooth Nuts, Bolt and Pin Bush

JCB range of Excavators is the best-in-class, which includes a wide array of large, mid & mini Excavators in the r... Read More

Capacity :
JCB Bucket Pin 42 mm Diameter : 1,666.7 Kgs / Day JCB Bucket Pin Bush : 1,666.7 Kgs / Day JCB Bucke
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
418.00Lakhs
Add To Inquiry Basket
Urea Fertilizer- Start Business in Fertilizer Industry
Urea Fertilizer- Start Business in Fertilizer Industry

Fertilizers provide three primary nutrients: Nitrogen (N), Phosphorus (P) and Potassium (K). Nitrogen supports vegetat... Read More

Capacity :
Urea Fertilizer: 972.2 MT / Day
Plant and Machinery cost:
4320.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
15110.00Lakhs
Add To Inquiry Basket
Manufacturing of Sodium Chlorite Liquid from Powder (31 Percent Liquid NaClO2)
Manufacturing of Sodium Chlorite Liquid from Powder (31 Percent Liquid NaClO2)

Sodium chlorite (NaClO2) is a chemical compound used in the manufacturing of paper and as a disinfect... Read More

Capacity :
Sodium Chlorite Liquid: 1.7 MT / Day
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
120.00Lakhs
Add To Inquiry Basket
Manufacturing of Banana Wafers (Deep Fried Snack Food)
Manufacturing of Banana Wafers (Deep Fried Snack Food)

Fried banana wafers are a deep fried snack food prepared from green fresh mature bananas of the cookin... Read More

Capacity :
Banana Wafers (40 gms size): 10,700 Packets / Day Banana Wafers (20 gms size): 21,300 Packets / Day
Plant and Machinery cost:
37.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
393.00Lakhs
Add To Inquiry Basket
Fruit Wine (Alcoholic Beverage) Manufacturing Plant
Fruit Wine (Alcoholic Beverage) Manufacturing Plant

Fruit wines are fermented alcoholic beverages made up of a variety of base ingredients (other tha... Read More

Capacity :
Fruit Wine (750 ml size Bollte): 2,666.7 Bottles / Day
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
873.00Lakhs
Add To Inquiry Basket
Production of Needles for Sewing and Embroidery Machine
Production of Needles for Sewing and Embroidery Machine

A sewing needle, used for hand-sewing, may be a long slender tool with a pointed tip at one end and a hole (... Read More

Capacity :
Sewing Needles (30 g each) per Pack 50 Pcs.: 6,400 Packs / Day Embroidery Needles (30 g each) per P
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
939.00Lakhs
Add To Inquiry Basket
Manufacturing of Pasta and Macaroni
Manufacturing of Pasta and Macaroni

Pasta may be a food that's loved by people of all age bracket. It not just ea... Read More

Capacity :
Pasta (1 Kg Pack): 13,000 Packs / Day Macaroni (1 Kg Pack) : 13,000 Packs / Day
Plant and Machinery cost:
863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
1300.00Lakhs
Add To Inquiry Basket
Aluminium Ingots (Aluminium Alloy Ingots) from Aluminium Scrap Manufacturing
Aluminium Ingots (Aluminium Alloy Ingots) from Aluminium Scrap Manufacturing

Ingots are very large casting products, greater in size and shape than blooms, billets and sla... Read More

Capacity :
Aluminium Alloy Ingots: 24 MT / Day Aluminium Scrap : 0.40 MT / Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
703.00Lakhs
Add To Inquiry Basket
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)
Manufacturing of CPVC (Chlorinated Polyvinyl Chloride)

 

CPVC could be a high-temperature plastic pressure piping system introduced for ... Read More

Capacity :
Chlorinated Polyvinyl Chloride: 80 MT/ Day
Plant and Machinery cost:
588.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
2283.00Lakhs
Add To Inquiry Basket
Plant‐Based Meat Alternatives -Meat Analogue, Vegan Meat & Mock Meat Manufacturing from Soyabean and Wheat Gluten
Plant‐Based Meat Alternatives -Meat Analogue, Vegan Meat & Mock Meat Manufacturing from Soyabean and Wheat Gluten

A meat analogue, also referred to as a meat alternative or substitute, or as mock, imitation, vegetarian, or vegan mea... Read More

Capacity :
Meat Analogue (200 gms each Pack): 1000 Packs / Day Vegan Meat (200 gms each Pack): 1000 Packs / Day
Plant and Machinery cost:
17.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
138.00Lakhs
Add To Inquiry Basket
Beer Production from Rice with Packaging in Can & Bottles
Beer Production from Rice with Packaging in Can & Bottles

Beer is distributed in bottles and cans and is additionally commonly available on draught, particularly in pubs and bars. The brewing industry may ... Read More

Capacity :
Rice Beer (650 ml Bottle):12,924 No’s/Day Rice Beer (500 ml Can): 16,800 No’s/Day
Plant and Machinery cost:
2631.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
4596.00Lakhs
Add To Inquiry Basket
Start Your Own Industry with Investment of 2.5 Crores
Start Your Own Industry with Investment of 2.5 Crores

Start Your Own Industry with Investment of 2.5 Crores (Plant and Machinery). Most Suc... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Battery Sprayer
Battery Sprayer

A sprayer is a device used to spray a liquid, where sprayers are commonly used for projection of water, weed kil... Read More

Capacity :
400 Pcs per day
Plant and Machinery cost:
16.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
110.00Lakhs
Add To Inquiry Basket
Lemon-Lime Flavoured Soft Drink  (Nimbu Pani)
Lemon-Lime Flavoured Soft Drink (Nimbu Pani)

Soft drinks include all drinks made from water or mineral water, sugar, aromas, and essences, and usually contain carb... Read More

Capacity :
50000 Bottles per day
Plant and Machinery cost:
98.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
700.00Lakhs
Add To Inquiry Basket
Condoms
Condoms

A condom is a thin, fitted tube. Condoms prevent pregnancies and STDs. They create a barrier that keeps semen an... Read More

Capacity :
500 Boxes per day
Plant and Machinery cost:
965.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
1963.00Lakhs
Add To Inquiry Basket
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.
Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Products.

Bioplastic Products Manufacturing Industry, Profitable Business Ideas on Biodegradable Produc... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bio-Based and Biodegradable Plastics Production
Bio-Based and Biodegradable Plastics Production

Bio-Based and Biodegradable Plastics Production. Profitable Business Ideas on Biodegr... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Idea of Double Edge Razor Blade Manufacturing
Business Idea of Double Edge Razor Blade Manufacturing

Business Idea of Double Edge Razor Blade Manufacturing. Production of Doubl... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biodegradable Sanitary Pad/Napkin Industry
Biodegradable Sanitary Pad/Napkin Industry

Biodegradable Sanitary Pad/Napkin Industry. Production of Compostable and Eco Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biodegradable Sanitary Pad/Napkin Industry.
Biodegradable Sanitary Pad/Napkin Industry.

Biodegradable Sanitary Pad/Napkin Industry. Production of Compostable and Eco Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Lemon-Lime Flavoured Soft Drink (Nimbu Pani) with Lemon Juice
Manufacturing of Lemon-Lime Flavoured Soft Drink (Nimbu Pani) with Lemon Juice

Manufacturing of Lemon-Lime Flavoured Soft Drink (Nimbu Pani) with Lemon Juice. Profitable Bu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Startup Business Opportunities in Sorbitol
Startup Business Opportunities in Sorbitol

Startup Business Opportunities in Sorbitol. Manufacturing of Sorbitol. Start Profitable Busin... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Pig Iron. Investment Opportunity in Steel and Iron Sector.
Manufacturing of Pig Iron. Investment Opportunity in Steel and Iron Sector.

Manufacturing of Pig Iron. Investment Opportunity in Steel and Iron Sector.<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Biomass Briquettes from Bio Waste
Biomass Briquettes from Bio Waste

Among the non-conventional forms of energy, Bio-Energy offers vast potential under Indian conditions, due to the wide ... Read More

Capacity :
20 MT per day
Plant and Machinery cost:
52.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
94.00Lakhs
Add To Inquiry Basket
Caustic Soda from Limestone and Sodium Carbonate (Soda Ash)
Caustic Soda from Limestone and Sodium Carbonate (Soda Ash)

Sodium hydroxide, also known as lye and cau... Read More

Capacity :
Caustic Soda from Limestone and Sodium Carbonate: 60 MT per day
Plant and Machinery cost:
171.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
827.00Lakhs
Add To Inquiry Basket
Smartphone Tempered Glass Screen Protector Manufacturing
Smartphone Tempered Glass Screen Protector Manufacturing

 

Smartphone Tempered Glass Screen Protector... Read More

Capacity :
9000 Pcs/Day
Plant and Machinery cost:
102.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Surgical & N95 Masks
Surgical & N95 Masks

A surgical mask, also known as a procedure mask, medical mask or simply as a face mask, is intended to be worn by health professionals during surge... Read More

Capacity :
Surgical Face Masks (each Pkts = 25 Pcs.): 1,694 Pkts / day N95 Face Masks (each Pkts = 5 Pcs.): 8,
Plant and Machinery cost:
350.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
865.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a descriptio... Read More

Capacity :
Aluminium : 3 MT / day Mild Steel: 2 MT / day Shredded PCB: 15.00 MT / day
Plant and Machinery cost:
88.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
533.00Lakhs
Add To Inquiry Basket
Emerging Investment Opportunities in Hydrated Lime (Calcium hydroxide) Production from Limestone
Emerging Investment Opportunities in Hydrated Lime (Calcium hydroxide) Production from Limestone

Emerging Investment Opportunities in Hydrated Lime (Calcium hydroxide) Production from Limestone (Calciu... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Production of Toothpaste
Production of Toothpaste

Production of Toothpaste. Emerging Investment Opportunities in Dental Hygiene

A <... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Downhole Seals Used for Oil and Gas Industry from Synthetic Rubber
Manufacturing of Downhole Seals Used for Oil and Gas Industry from Synthetic Rubber

Manufacturing of Downhole Seals Used for Oil and Gas Industry from Synthetic Rubber.

D... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Indian Kitchen Spices
Manufacturing of Indian Kitchen Spices

Manufacturing of Packaged Spices, Spices Powder, Blended Spices,... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Talc Manufacture from Talc Ore  (Cosmetic Grade)
Talc Manufacture from Talc Ore (Cosmetic Grade)

Talc may be a naturally-occurring mineral utilized in some consumer products, including personal care products like co... Read More

Capacity :
Cosmetic Grade Talc: 32 MT / Day
Plant and Machinery cost:
143.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
954.00Lakhs
Add To Inquiry Basket
PET Polyester Acoustic Panel Production
PET Polyester Acoustic Panel Production

Acoustic panels are sound absorbing panels placed on walls or ceilings to regulate and reduce noise, eliminate slap echo and control comb filtering... Read More

Capacity :
PET Polyester Acoustic Panel (Size 4' x8'x1"): 666.7 Pcs / Day
Plant and Machinery cost:
286.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
1048.00Lakhs
Add To Inquiry Basket
Beer & Wine Manufacturing Plant
Beer & Wine Manufacturing Plant

Beer is that the world's oldest beverage, possibly dating back to the 6th millennium BC. It’s also the most wide... Read More

Capacity :
Beer (650 ml size Bottle): 30,077 Bottles / Day Wine (750 ml size Bottle): 445 Bottles / Day
Plant and Machinery cost:
2086.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
3913.00Lakhs
Add To Inquiry Basket
Investment Opportunity for Startups
Investment Opportunity for Startups

Investment Opportunity for Startups in Essential Oil, Active Zinc Oxide from Zinc Ash, Talc ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Manufacturing Business of... 12 MT per Day 31.00 595.00
Prestressed Concrete Slee... 1,000 Pcs per Day 27.00 3812.00
Business Plan for Manufac... 600 Kgs Per day 29.00 160.00
Set up your own Maize Pro... Maize Starch 150 MT Per Day Liquid Glucose 20 MT Per Day Maltodextrin 18 MT Per Day Gluten as by Pro 21.00 17100.00
Recycling of Lithium Ion ... Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L 27.00 422.00
Start Production Business... 300 Cu.Mtres Per Day 25.00 1070.00
Start Production of Ethan... Ethanol 30 Units per day Cattle feed as by Product 27 Units per day 26.00 3900.00
Set up Lithium Ion Batter... 0 0.00 0.00
Detailed Project Report o... 8 MT Per Day 28.00 656.00
Steel Shots and Grits (St... 40 MT per day 28.00 1884.00
PVC Edge Banding Tape Man... PVC Edge Banding Tape (Size 22 mm, 50 meter, 1 mm Roll) 303,030 Meter Per Day 30.00 1383.00
Manufacturing of Ascorbi... Ascorbic Acid (Powder) 8.3 MT Per Day Carbon Di-oxide by Product 11.6 MT Per Day Sodium Hyd 29.00 2444.00
AAC Blocks from Silica Sa... 0 0.00 0.00
Pre Feasibility Report on... Liquor 750 ml Size: 667 Bottles/Day Liquor 375 ml Size:1,334 Bottles/Day Liquor 180 ml: 2,778 Bottle 33.00 500.00
Start Flexographic Ink fo... R Non-Absorbent Substrate Flexographic Ink: 160 Kgs/Day | R Absorbent Substrate: 160 Kgs/Day 27.00 64.00
Start Automated Vehicle S... Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St 32.00 5100.00
Lithium Ion Battery Recyc... 0 0.00 0.00
Want to start a Calcium P... 0 0.00 0.00
3-Chloropivaloyl Chloride... 3-Chloropivaloyl Chloride: 4 MT Per Day | Hydrochoric Acid (30%)- by product: 3 MT Per Day 27.00 686.00
Start Quartz Slabs Manufa... 250 Nos. per day 27.00 3200.00
Project Profile on Sodium... 4500 MT Per Annum 27.00 214.00
Rice Husk based Biodegrad... Biodegradable Cutlery (Per Set 6 Pcs. Flatware): 1,852 Sets Per Day 27.00 222.00
Lithium Ion Battery LiFeP... Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day 29.00 970.00
Ferric Pyrophosphate Prod... 600 MT Per Annum 29.00 133.00
Set Up Production Unit of... 300 MT Per Annum 28.00 70.00
Start Production Business... 10 MT per day 45.00 1300.00
Production of Malic Acid ... 0 0.00 0.00
Ferric Pyrophosphate: Sta... 0 0.00 0.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Start Production Business... Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day 28.00 20700000.00
12345678910...

Showing 181 - 240 of 2746 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR